References

  • Cherepetskaya GRES Power Plant
    Supply and installation of high-pressure turbine pipelines and internal turbine pipelines for two power generating unit No. 8 and No. 9 with a capacity of 225 MW.
  • Novourengoysky Gas Chemical Complex
    Supply and installation of two waste heat boilers No. 1 and No. 2 КТГ-45/6,7-450-15/09-270 for the combined cycle gas turbine unit with a capacity of 120 MW (120 MW CCGT unit).
  • Verkhnetagilskaya GRES Power Plant
    Supply of equipment, assembly, construction, installation, commissioning of the gas supply system of the combined-cycle power unit with a capacity of 420 MW.
  • Permskaya GRES Power Plant
    Supply and installation of the equipment for the gas supply system of the combined-cycle power unit with a capacity of 420 MW.
  • TPE
    Supply of the equipment, assembly, construction, installation, commissioning of the gas supply system of four combined-cycle power units with a unit capacity of 240 MW.
  • PJSC «Tulachermet-Steel»
    Supply of materials, assembly, construction, installation, commissioning.